Meredith Drive - 156th Street to 170th Street

Project Description:

This project provides for the reconstruction of Meredith Drive from 156th Street west to ¼ mile east of 170th Street as a four-lane roadway with left-turn lanes including grading, and storm sewer. The paving will be portland cement concrete with two 26-foot wide paving sections and a 28-foot grass median and a 10-foot trail on the north side. This is a joint project with the City of Clive. The project is anticipated to be completed in late spring of 2020.

Project Status Update - 12/06/19

Stage 1 is open to traffic. Temporary single lanes closures will be required next spring for sidewalk/trail construction.

Stage 2 is open to traffic. Temporary single lanes closures will be required next spring for turn lane and sidewalk/trail construction.

The contractor will be closing 169th Street today for replacement at Meredith Drive. Access will be provided at 167th Street.